Just after 5:00 am a Box Assignment was dispatched for reported dwelling fires in the area of Marley Neck Rd and E. Howard Rd. Eng 181 arrived on sence with two dwelling 100% involved with extenion into a third. Tower 11 arrived as the first due truck and set up ladder pipe ops on side A. The Tower flowed water for appox. three hours taking care of 90% the fire.